Your reliable partner for test management and execution.

We support you throughout every stage of the test cycle and find the right approach to your test management

With recognized methods and standards, process expertise and many years of practical project experience, we support your test project.

We work with you to implement efficient test management:

  • plan, to integrate the test plan into your project plan,
  • verify, verify that all requirements are covered,
  • validate, that all test objects function completely and in accordance with requirements
  • integrated error management

We accompany you throughout the entire duration of your project and support you in the implementation of effective and efficient test management.

Test control system and Test monitoring

Planning

quattron works with you to define the test objectives and create test concepts. These form the basis for initial scheduling. These provide the basis for initial time planning.

Analysis

quattron analyses the test basis and specifies the necessary test conditions.

Draft

quattron assists with the design of abstract test cases, the test environment and the necessary testing tools.

Realisation

quattron supports the design of abstract test cases as well as the test environment and necessary test tools.

Execution

quattron supports you in executing the test cases, whether in a laboratory environment or a field test. Day and night if required. Day and night if required.

Conclusion

quattron logs the test results and summarises them in reports. We transfer the results to your fault management system and analyse the findings with you.

Field Tests

Reliable tests of an overall system show the progress a project has made. In field tests, the interaction of all system components is tested in reality for the first time. Quattron provides expertise for the preparation, implementation and follow-up of comprehensive field tests.

The testing of complex systems involves multi-stage processes. One of these stages is the field test. In this test, the final test steps are carried out in the real environment, ideally at the planned place of use, in order to assess the functionality of the overall system. quattron provides comprehensive knowledge and maximum flexibility
in all three levels of a field test.

  • Preparation
    Together with your technical experts, we develop effective and efficient test scenarios. Through our analyses of the infrastructure, such as switches, signals and stops, we find the optimum locations for carrying out the test scenarios.
    We also provide support in the selection and procurement of additional equipment for testing (e.g. cameras).
  • Realisation
    Together with your staff, we test your entire system; day and night if necessary. We will implement the documentation
    of test results quickly and easily.
  • Follow-up work
    After the tests, we are there for you and support you with targeted analyses of test results. You can also entrust us with your
    error management; we ensure that any anomalies detected are quickly checked.

We planned, carried out and documented ETCS test runs for our customer ÖBB.

Thanks to our support and the recording of distance and DMI, subsequent analyses are possible; the test time in the field is minimised.

We are also on the road at night for our customers in order to minimise disruption to regular operations.

The collection of route information, DMI displays and JRU data enables subsequent analyses; this can minimize the repetition of test drives.

FAQs

What does quattron engineering offer in the field of test management?
We provide support throughout all phases of the test cycle, drawing on recognised methods, standards and many years of project experience to ensure efficient test management.